"How long will my flooring installation take?" It's one of the first questions Austin homeowners ask. The answer depends on your flooring type, project size, and home's condition. As Travis County's experienced flooring contractor, we've completed thousands of installations. Here's what to expect.

LVP Installation Timeline

Luxury vinyl plank installs fastest of all flooring types.

Total time: 2-4 days for average home (1,000-1,500 sq ft)

Day 1: Acclimation begins (48-72 hours before installation) Day 2-3: Installation (500-800 sq ft per day) Day 4: Trim, transitions, cleanup

You can walk on it: Immediately after installation

Move furniture back: Same day or next day

Why it's fast: Click-lock installation, no adhesive drying time, no finishing required

Best for: Homeowners needing quick turnaround

Hardwood Installation Timeline

Hardwood requires more time due to acclimation and finishing.

Total time: 7-14 days

Days 1-7: Acclimation (wood adjusts to your home's humidity) Days 8-9: Installation (300-500 sq ft per day) Days 10-12: Sanding and finishing (if unfinished wood) Days 13-14: Final cure, can move furniture

You can walk on it: 24-48 hours after final finish coat

Full cure: 7-10 days (avoid heavy furniture, rugs)

Why it takes longer: Acclimation is critical in Austin's variable humidity. Rushing causes gaps or cupping.

Best for: Homeowners with flexibility, planning ahead

Tile Installation Timeline

Tile requires setting time for mortar and grout.

Total time: 4-7 days for average bathroom or kitchen

Day 1: Subfloor prep, waterproofing (if needed) Days 2-3: Tile installation Day 4: Grout application Days 5-6: Grout curing, sealing Day 7: Final cleanup, can use space

You can walk on it: 24-48 hours after grouting (light traffic)

Full use: 72 hours after grouting

Why it takes time: Mortar and grout need proper curing for durability

Best for: Bathrooms, kitchens, entryways

Hardwood Refinishing Timeline

Refinishing existing hardwood is faster than replacement.

Total time: 3-5 days

Day 1: Sanding (dusty, noisy) Day 2: Staining (if changing color) Days 3-4: Finish coats (2-3 coats) Day 5: Final cure, move furniture

You can walk on it: 24-48 hours after final coat

Full cure: 7 days (avoid rugs, heavy furniture)

Why it's faster: No acclimation needed, no subfloor work

Best for: Updating existing hardwood

Factors That Affect Timeline

Home size: Larger homes take proportionally longer

Furniture moving: Empty rooms install faster. We can move furniture for additional fee.

Subfloor condition: Repairs add 1-3 days

Complex layouts: Diagonal patterns, borders, multiple rooms add time

Material availability: Custom orders may require 2-4 week lead times

Austin weather: Extreme humidity or temperature may require climate control during installation

What Slows Projects Down

Moisture issues: Must be resolved before installation (adds days to weeks)

Uneven subfloors: Leveling adds 1-2 days

Asbestos in old flooring: Requires professional abatement (adds week+)

Permit requirements: Some Travis County areas require permits (adds 1-2 weeks)

Change orders: Deciding to change materials mid-project restarts timeline

How to Speed Up Your Project

Prepare in advance:

  • Empty rooms before installation day
  • Remove baseboards if requested
  • Ensure clear access to work areas
  • Have pets/kids stay elsewhere during installation
  • Make decisions early:

  • Choose materials 2-3 weeks before installation
  • Decide on transitions, trim, and details upfront
  • Have backup material choices in case of availability issues
  • Maintain climate control:

  • Keep HVAC running during installation
  • Maintain 60-80°F and 30-50% humidity
  • Critical for hardwood and some adhesives
  • Typical Project Timeline from Start to Finish

    Week 1: Initial consultation, measurements, material selection

    Week 2-3: Material ordering, delivery (custom orders may take longer)

    Week 4: Installation begins

    Week 5: Project completion, final walkthrough

    Total: 4-5 weeks from first contact to finished floor

    Rush jobs possible for LVP and tile with in-stock materials (as fast as 1-2 weeks total).

    Get Your Free Estimate with Timeline

    Planning a flooring project? We provide detailed timelines with every estimate so you can plan accordingly.

    Call us today: (512) 769-2292 Email: [email protected]

    We'll assess your project, provide realistic timelines, and work with your schedule.

    ---

    Related Articles

  • LVP vs Hardwood in Austin - Compare flooring options
  • 2026 Austin Flooring Trends - Current trends
  • Our Services

  • LVP Installation - Fast, waterproof flooring
  • Hardwood Installation - Beautiful hardwood floors
  • Tile Installation - Durable tile flooring
  • Hardwood Refinishing - Restore existing floors

Serving Central Texas

Austin

Round RockCedar ParkGeorgetownPflugervilleLeander
All Travis & Williamson Counties

---

*Capital City Flooring Austin completes projects on time and on budget. Our experienced crews work efficiently while maintaining quality standards that ensure your floors last decades.*

Ready to Transform Your Floors?

Get expert flooring advice and a free estimate for your Austin home.