Choose the project direction and features you want to discuss. This local planning tool creates a site-visit agenda; it does not approve drainage, waterproofing, structural work, plumbing changes, glass, permits, or an installation method.
Record the shower direction, entry preference, dimensions you can safely observe, and requested features. Unknown measurements stay unknown. The output is a discussion summary, not an order quantity, construction drawing, or client-ready price proposal.
A curb-free preference is not a feasibility approval. Existing floor structure, drain location, drainage path, water containment, the chosen water-management assembly, and product instructions still need field review. The ICC’s published shower-receptor section explains why drainage toward the drain and a watertight drain connection are assembly questions rather than a selection in this tool.
Austin Development Services states that a new installation or replacement of a shower, tub, or combination tub and shower is not exempt from permit requirements. Confirm the actual project scope, trade coordination, permit path, and inspections with the jurisdiction and responsible trades before work is planned.
Project planning tools | Related service | Request an estimate